26FE07 Search Results
26FE07 Datasheets Context Search
Catalog Datasheet | Type | Document Tags | |
---|---|---|---|
Contextual Info: 16 15 14 13 12 11 10 $ S MISSING SYMBOLS SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M TOTAL NO OF INSPECTIONS REQUIRED 5 LAST NO. USED 5 NO MISSING |
OCR Scan |
24JL06 PE154660 26FE07 10AP07 19AP07 | |
Contextual Info: 16 15 14 13 12 CD M 11 $ 10 S MISSING SYMBOLS SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. ▲ — 45.5 ±0.2 12.25 ▲ CD TOTAL NO OF INSPECTIONS |
OCR Scan |
||
Contextual Info: 24 23 22 21 20 19 17 IB 16 15 14 12 13 10 11 V 7 8 SYMBOL D E F I N I T I O N C 26-27 2X M A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL O DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON AN INDIVIDUAL COMPONENT DRAWING. 21 A 0 0 .3 D 18 15 21-22 ) |
OCR Scan |
25MY04 | |
Contextual Info: 16 15 14 13 12 11 $ 10 a A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M DWG STATUS MISSING SYMBOLS SYMBOL DEFINITION TOTAL NO OF INSPECTIONS REQUIRED LAST NO. USED |
OCR Scan |
17JL06 26FE07 19AP07 |